B & H Painting and Decorating · Serving Peachland
New construction painters
in Peachland.
Built on detail.
From your building plans to the rooms that feel like home. Bring Harris your plans, painting scope and expected construction dates to discuss preparation, interior and exterior finishes, and site coordination.
A builder’s painting partner
The finish begins before the first coat.
New homes have been Harris’s main focus for more than 25 years. Working alongside his dad, he has painted hundreds of show homes and developed long-standing relationships with residential contractors.
For your Peachland project, start with the details that affect the work: the new substrates, the finish schedule, the rooms and elevations included, and the point at which the site will be ready. A clear scope helps everyone plan the painting stage.
- 01
Review the drawings
Share floor plans and elevations. Identify the walls, ceilings, doors, trim and exterior materials to be included, including high ceilings and difficult access.
- 02
Agree on the finish
Discuss colours, sheen and the coating requirements for each surface. Confirm the preparation included in the quote, as well as who will supply or prepare each area.
- 03
Coordinate the site
Discuss access, surface readiness and the work of other trades. Keep Harris informed when construction dates or drywall completion change.
- 04
Walk through together
Review the agreed painting areas and finishing details with the site team as the home moves toward handover. Confirm how remaining items will be addressed.
New-home interiors
Quiet rooms. Precise details.
Walls, ceilings, doors and trim give each room its finished character. Discuss colour transitions, sheen and the preparation needed for new drywall and woodwork. Make the included rooms and surfaces clear before work starts.
New drywall, filled fixing points and different wood materials can need different primers or preparation. Agree the paint system and finishing expectations before application, using premium-quality products suited to the specification.
Make room for the painting stage in the construction sequence. Surfaces need to be ready, the area accessible and other trade activity coordinated. Changes to the site should be discussed before they affect the agreed work.
Exterior new-construction painting
A considered finish outside.
Siding, trim, posts and beams need finishes suited to their materials and exposure. Confirm the exterior surfaces in the scope, then plan application around site access, weather and the coating manufacturer’s requirements.
Choose finishes for the way the home will be used and the surfaces being coated. Product selection, preparation and application should reflect the project specification, rather than treating every substrate as the same.
The covered-deck photograph is from the H&H Custom Homes project at 255 Feathertop Way, Big White. It is a regional project example, with its own location and builder attribution.
Reputation and project evidence
See the work. Read the experience.
Our established reviews page brings original customer feedback and detailed local award records together. Read the customer’s actual experience and ask Harris about references relevant to a custom-home or residential construction scope.
The portfolio includes homes elsewhere in the Okanagan. Photographs on this page illustrate company work and finishing details; they do not imply that each pictured home is in Peachland.
Useful answers
Builder questions: Peachland new homes
Do you work with builders on new houses in Peachland?
Yes. Residential new construction is the main focus of B & H Painting and Decorating. Harris works with builders and new-home clients on interior and exterior painting scopes. Share your Peachland site location, plans and expected schedule to discuss the work and current availability.
What should I include when asking for a new-home painting quote?
Send plans or a room schedule, approximate dates and a list of surfaces to be painted. Include ceiling heights, doors and trim, exterior materials, colours and any specified products. Identify what the builder or another trade will supply or prepare so the quote describes the painting scope clearly.
How do we plan painting if the construction schedule changes?
Tell Harris when drywall completion, other trade work or site access changes. Confirm that surfaces are ready and agree on the painting sequence before the stage begins. Exterior work also depends on suitable weather and the selected product’s application conditions. Dates and availability are discussed for the individual build.
Is B & H Painting based in Peachland?
B & H Painting and Decorating is based in West Kelowna and serves Peachland, Kelowna and the Okanagan. This page describes painting services for Peachland new homes; the portfolio also includes projects elsewhere in the region.
Continue exploring
Plan the rest of your build
Speak with Harris
Bring the plans. Let’s plan the finish.
Send drawings, elevations, finish schedules and anticipated painting dates. Identify the new surfaces, site readiness and any work supplied by other trades before the painting stage is agreed.



