New construction house painters in Kelowna
Use this guide to prepare for the painting phase of a custom home, from the finish schedule to the final walkthrough.

Put the finish schedule beside the drawings
Identify walls, ceilings, doors, trim, feature finishes and exterior surfaces by room or elevation. Confirm who supplies the final colour and sheen decisions and who approves samples. Our new-construction painting process explains how we review the scope.
Agree on the handoff from other trades
Review when drywall finishing, repairs, trim and other surfaces will be ready. Share the intended painting window, access, lighting, power and protection requirements. The builder scheduling guide covers the main handoffs.
Match the prep and coating to the surface
Discuss who will address unfinished patches, damage and contaminants. Use the surface preparation guide and priming guide to ask about substrate condition and coating compatibility before work starts.
Record the approvals and handover
Check the agreed rooms, trim and exterior surfaces together and keep a record of the approved finishes. See the finish craftsmanship guide for what to review. You can also browse the Feathertop showhome case study and our local experience page.